# WHOOSH Roadmap _Last updated: 2025-02-15_ This roadmap breaks the WHOOSH council formation platform into phased milestones, sequencing the work needed to evolve from the current council-focused release to fully autonomous team orchestration with reliable telemetry and UI coverage. ## Phase 0 – Alignment & Readiness (Week 0) - Confirm owners for API/persistence, analysis ingestion, deployment orchestrator, and UI work streams. - Audit existing deployments (Docker Swarm + Postgres) for parity with production configs. - Capture outstanding tech debt from `DEVELOPMENT_PLAN.md` into tracking tooling with the milestone tags below. **Exit criteria** - Ownership assigned with sprint plans. - Backlog groomed with roadmap milestone labels (`WSH-API`, `WSH-ANALYSIS`, `WSH-OBS`, `WSH-AUTO`, `WSH-UX`). ## Phase 1 – Hardening the Data Path (Weeks 1–4) - **WSH-API (Weeks 1–2)** - Replace mock project/council handlers with Postgres read/write paths. - Add migrations + integration tests for repository, issue, council, and artifact tables. - **WSH-ANALYSIS (Weeks 2–4)** - Pipe Gitea/n8n analysis results into composer inputs (tech stack, requirements, risk flags). - Persist analysis snapshots and expose via API. **Exit criteria** - WHOOSH API/UI operates solely on persisted data; no mock payloads in server handlers. - New/Analyze flows populate composer with real issue metadata. ## Phase 2 – Deployment Telemetry & Observability (Weeks 4–7) - **WSH-OBS (Weeks 4–6)** - Record deployment results in database and surface status in API/UI. - Instrument Swarm deployment with structured logs + Prometheus metrics (success/failure, duration). - **WSH-TELEM (Weeks 5–7)** - Emit telemetry events for KACHING (council/job counts, agent minutes, failure alerts). - Build Grafana/Metabase dashboards for council throughput and deployment health. **Exit criteria** - Deployment outcomes visible in UI and exportable via API. - Telemetry feeds KACHING pipeline with validated sample data; dashboards in place. ## Phase 3 – Autonomous Team Evolution (Weeks 7–10) - **WSH-AUTO (Weeks 7–9)** - Turn composer outputs into actionable team formation + self-joining flows. - Enforce role availability caps, load balancing, and join/leave workflows. - **WSH-COLLAB (Weeks 8–10)** - Integrate HMMM rooms & capability announcements for formed teams. - Add escalation + review loops via SLURP/BUBBLE decision hooks. **Exit criteria** - Councils hand off to autonomous teams with recorded assignments. - Team state synced to SLURP/BUBBLE/HMMM; QA sign-off on end-to-end kickoff-to-deliverable scenario. ## Phase 4 – UX & Governance (Weeks 10–12) - **WSH-UX (Weeks 10–11)** - Polish admin dashboard: council progress, telemetry widgets, failure triage. - Document operator runbooks in `docs/admin-guide`. - **WSH-GOV (Weeks 11–12)** - Generate Decision Records for major orchestration flows (UCXL addresses linked). - Finalize compliance hooks (SHHH redaction, audit exports). **Exit criteria** - Admin/operator journeys validated; documentation complete. - Decision Records published; compliance/audit requirements satisfied. ## Tracking & Reporting - Weekly sync across work streams with burndown, blocker, and risk review. - Metrics to monitor: council formation latency, deployment success %, telemetry delivery rate, autonomous team adoption. - All major architecture/security decisions recorded in SLURP/BUBBLE at the relevant UCXL addresses.