3.4 KiB
3.4 KiB
WHOOSH Roadmap
Last updated: 2025-02-15
This roadmap breaks the WHOOSH council formation platform into phased milestones, sequencing the work needed to evolve from the current council-focused release to fully autonomous team orchestration with reliable telemetry and UI coverage.
Phase 0 – Alignment & Readiness (Week 0)
- Confirm owners for API/persistence, analysis ingestion, deployment orchestrator, and UI work streams.
- Audit existing deployments (Docker Swarm + Postgres) for parity with production configs.
- Capture outstanding tech debt from
DEVELOPMENT_PLAN.mdinto tracking tooling with the milestone tags below.
Exit criteria
- Ownership assigned with sprint plans.
- Backlog groomed with roadmap milestone labels (
WSH-API,WSH-ANALYSIS,WSH-OBS,WSH-AUTO,WSH-UX).
Phase 1 – Hardening the Data Path (Weeks 1–4)
- WSH-API (Weeks 1–2)
- Replace mock project/council handlers with Postgres read/write paths.
- Add migrations + integration tests for repository, issue, council, and artifact tables.
- WSH-ANALYSIS (Weeks 2–4)
- Pipe Gitea/n8n analysis results into composer inputs (tech stack, requirements, risk flags).
- Persist analysis snapshots and expose via API.
Exit criteria
- WHOOSH API/UI operates solely on persisted data; no mock payloads in server handlers.
- New/Analyze flows populate composer with real issue metadata.
Phase 2 – Deployment Telemetry & Observability (Weeks 4–7)
- WSH-OBS (Weeks 4–6)
- Record deployment results in database and surface status in API/UI.
- Instrument Swarm deployment with structured logs + Prometheus metrics (success/failure, duration).
- WSH-TELEM (Weeks 5–7)
- Emit telemetry events for KACHING (council/job counts, agent minutes, failure alerts).
- Build Grafana/Metabase dashboards for council throughput and deployment health.
Exit criteria
- Deployment outcomes visible in UI and exportable via API.
- Telemetry feeds KACHING pipeline with validated sample data; dashboards in place.
Phase 3 – Autonomous Team Evolution (Weeks 7–10)
- WSH-AUTO (Weeks 7–9)
- Turn composer outputs into actionable team formation + self-joining flows.
- Enforce role availability caps, load balancing, and join/leave workflows.
- WSH-COLLAB (Weeks 8–10)
- Integrate HMMM rooms & capability announcements for formed teams.
- Add escalation + review loops via SLURP/BUBBLE decision hooks.
Exit criteria
- Councils hand off to autonomous teams with recorded assignments.
- Team state synced to SLURP/BUBBLE/HMMM; QA sign-off on end-to-end kickoff-to-deliverable scenario.
Phase 4 – UX & Governance (Weeks 10–12)
- WSH-UX (Weeks 10–11)
- Polish admin dashboard: council progress, telemetry widgets, failure triage.
- Document operator runbooks in
docs/admin-guide.
- WSH-GOV (Weeks 11–12)
- Generate Decision Records for major orchestration flows (UCXL addresses linked).
- Finalize compliance hooks (SHHH redaction, audit exports).
Exit criteria
- Admin/operator journeys validated; documentation complete.
- Decision Records published; compliance/audit requirements satisfied.
Tracking & Reporting
- Weekly sync across work streams with burndown, blocker, and risk review.
- Metrics to monitor: council formation latency, deployment success %, telemetry delivery rate, autonomous team adoption.
- All major architecture/security decisions recorded in SLURP/BUBBLE at the relevant UCXL addresses.