Files
bzzz/install/PLAN_COMPARISON.md
anthonyrawlins c177363a19 Save current BZZZ config-ui state before CHORUS branding update
🤖 Generated with [Claude Code](https://claude.ai/code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-08-19 00:19:00 +10:00

9.5 KiB

BZZZ Installer: Plan vs Implementation Comparison

Executive Summary

Our enhanced installer (install-chorus-enhanced.sh) addresses Phase 1: Initial Node Setup but diverges significantly from the original comprehensive deployment plan. The implementation prioritizes immediate functionality over the sophisticated multi-phase security architecture originally envisioned.

Phase-by-Phase Analysis

Phase 1: Initial Node Setup & Key Generation

Original Plan:

  • Web UI at :8080/setup for configuration
  • Master key generation with ONCE-ONLY display
  • Shamir's Secret Sharing for admin keys
  • Security-first design with complex key management

Our Implementation:

  • Single-command installation (curl | sh)
  • System detection and validation
  • BZZZ binary installation
  • Interactive configuration prompts
  • MAJOR GAP: No web UI setup interface
  • CRITICAL MISSING: No master key generation
  • SECURITY GAP: No Shamir's Secret Sharing
  • SIMPLIFICATION: Basic YAML config instead of sophisticated key management

Gap Assessment: 🔴 SIGNIFICANT DEVIATION The enhanced installer implements a simplified approach focused on repository integration rather than the security-first cryptographic design.

Phase 2: SSH Cluster Deployment

Original Plan:

  • Web UI for manual IP entry
  • SSH-based remote installation across cluster
  • Automated deployment to multiple nodes
  • Cluster coordination through central web interface

Our Implementation:

  • Manual installation per node (user runs script on each machine)
  • Repository configuration with credentials
  • MISSING: No SSH-based remote deployment
  • MISSING: No centralized cluster management
  • MANUAL PROCESS: User must run installer on each node individually

Gap Assessment: 🔴 NOT IMPLEMENTED Current approach requires manual installation on each node. No automated cluster deployment.

Phase 3: P2P Network Formation & Capability Discovery

Original Plan:

  • Automatic P2P network bootstrap
  • Capability announcement (GPU, CPU, memory, storage)
  • Dynamic network topology optimization
  • Shamir share distribution across peers

Our Implementation:

  • P2P network components exist in codebase
  • Node capability configuration in YAML
  • MISSING: No automatic capability discovery
  • MISSING: No dynamic network formation
  • MISSING: No Shamir share distribution

Gap Assessment: 🔴 FOUNDATIONAL MISSING P2P capabilities exist but installer doesn't configure automatic network formation.

Phase 4: Leader Election & SLURP Responsibilities

Original Plan:

  • Sophisticated leader election with weighted scoring
  • SLURP (Service Layer Unified Resource Protocol) coordination
  • Leader handles resource orchestration and model distribution
  • Clear separation between Leader (operations) and Admin (oversight)

Our Implementation:

  • Election code exists in codebase (pkg/election/)
  • SLURP architecture implemented
  • MISSING: No automatic leader election setup
  • MISSING: No SLURP coordination configuration
  • CONFIGURATION GAP: Manual role assignment only

Gap Assessment: 🔴 ADVANCED FEATURES MISSING Infrastructure exists but not activated by installer.

Phase 5: Business Configuration & DHT Storage

Original Plan:

  • DHT network for distributed business data storage
  • UCXL addressing for configuration data
  • Migration from local to distributed storage
  • Encrypted business data in DHT

Our Implementation:

  • DHT code exists (pkg/dht/)
  • UCXL addressing implemented
  • MISSING: No DHT network activation
  • MISSING: No business data migration
  • BASIC CONFIG: Simple local YAML files only

Gap Assessment: 🔴 DISTRIBUTED STORAGE UNUSED Sophisticated storage architecture exists but installer uses basic local configs.

Phase 6: Model Distribution & Synchronization

Original Plan:

  • P2P model distribution based on VRAM capacity
  • Automatic model replication and redundancy
  • Load balancing and geographic distribution
  • Version synchronization (marked as TODO in plan)

Our Implementation:

  • Ollama integration for model management
  • Model installation via command line flags
  • MISSING: No P2P model distribution
  • MISSING: No automatic model replication
  • SIMPLE: Local Ollama model installation only

Gap Assessment: 🔴 BASIC MODEL MANAGEMENT Individual node model installation, no cluster-wide distribution.

Phase 7: Role-Based Key Generation

Original Plan:

  • Dynamic role definition via web UI
  • Admin key reconstruction for role signing
  • Role-based access control deployment
  • Sophisticated permission management

Our Implementation:

  • Repository-based role assignment (basic)
  • Agent role configuration in YAML
  • MISSING: No dynamic role creation
  • MISSING: No key-based role management
  • BASIC: Simple string-based role assignment

Gap Assessment: 🔴 ENTERPRISE FEATURES MISSING Basic role strings instead of cryptographic role management.

Implementation Philosophy Divergence

Original Plan Philosophy

  • Security-First: Complex cryptographic key management
  • Enterprise-Grade: Sophisticated multi-phase deployment
  • Centralized Management: Web UI for cluster coordination
  • Automated Operations: SSH-based remote deployment
  • Distributed Architecture: DHT storage, P2P model distribution

Our Implementation Philosophy

  • Simplicity-First: Get working system quickly
  • Repository-Centric: Focus on task coordination via Git
  • Manual-Friendly: User-driven installation per node
  • Local Configuration: YAML files instead of distributed storage
  • Immediate Functionality: Working agent over complex architecture

Critical Missing Components

🔴 HIGH PRIORITY GAPS

  1. Web UI Setup Interface

    • Original: Rich web interface at :8080/setup
    • Current: Command-line prompts only
    • Impact: No user-friendly cluster management
  2. Master Key Generation & Display

    • Original: One-time master key display with security warnings
    • Current: No cryptographic key management
    • Impact: No secure cluster recovery mechanism
  3. SSH-Based Cluster Deployment

    • Original: Deploy from one node to entire cluster
    • Current: Manual installation on each node
    • Impact: Scaling difficulty, no centralized deployment
  4. Automatic P2P Network Formation

    • Original: Nodes discover and organize automatically
    • Current: Static configuration per node
    • Impact: No dynamic cluster topology

🟡 MEDIUM PRIORITY GAPS

  1. Shamir's Secret Sharing

    • Original: Distributed admin key management
    • Current: No key splitting or distribution
    • Impact: Single points of failure
  2. Leader Election Activation

    • Original: Automatic leader selection with weighted scoring
    • Current: Manual coordinator assignment
    • Impact: No dynamic leadership, manual failover
  3. DHT Business Configuration

    • Original: Distributed configuration storage
    • Current: Local YAML files
    • Impact: No configuration replication or consistency
  4. P2P Model Distribution

    • Original: Cluster-wide model synchronization
    • Current: Individual node model management
    • Impact: Manual model management across cluster

Architectural Trade-offs Made

GAINED: Simplicity & Speed

  • Fast installation (single command)
  • Working system in minutes
  • Repository integration works immediately
  • Clear configuration files
  • Easy troubleshooting

LOST: Enterprise Features

  • No centralized cluster management
  • No cryptographic security model
  • No automatic scaling capabilities
  • No distributed configuration
  • No sophisticated failure recovery

Recommendations

Short-term (Immediate)

  1. Document the gap - Users need to understand current limitations
  2. Manual cluster setup guide - Document how to deploy across multiple nodes manually
  3. Basic health checking - Add cluster connectivity validation
  4. Configuration templates - Provide coordinator vs worker config examples

Medium-term (Next Phase)

  1. Web UI Development - Implement the missing :8080/setup interface
  2. SSH Deployment Module - Add remote installation capabilities
  3. P2P Network Activation - Enable automatic peer discovery
  4. Basic Key Management - Implement simplified security model

Long-term (Strategic)

  1. Full Plan Implementation - Gradually implement all 7 phases
  2. Security Architecture - Add Shamir's Secret Sharing and master keys
  3. Enterprise Features - Leader election, DHT storage, model distribution
  4. Migration Path - Allow upgrading from simple to sophisticated deployment

Conclusion

Our enhanced installer successfully delivers immediate functionality for repository-based task coordination but represents a significant simplification of the original comprehensive plan.

Current State: Single-node ready, repository integrated, immediately useful Original Vision: 🔴 Enterprise-grade, security-first, fully distributed cluster

The implementation prioritizes time-to-value over comprehensive architecture. While this enables rapid deployment and testing, it means users must manually scale and manage clusters rather than having sophisticated automated deployment and management capabilities.

Strategic Decision Point: Continue with simplified approach for rapid iteration, or invest in implementing the full sophisticated architecture as originally planned.